Skip to main content

Dudley and Northside 2025

Dudley School and Northside School

Fairport for the Future 2025 at Dudley and Northside

The unique character and needs of the Dudley and Northside school facilities have defined the scope of the project at these two schools. The Fairport for the Future 2025 project proposal for Dudley and Northside includes some complete classroom renovations, along with upgrades to air conditioning and flooring and enclosing their extraordinary libraries.

 

 

A floor plan shows the Dudley Elementary School renovation project, including highlighted areas for new flooring, air conditioning, classroom renovations, bathroom renovations and health and safety updates.

Scope of proposed work at Dudley School:

  • Select classroom renovations, including walls, doors, flooring and classroom bathrooms
  • Library corridor wall and air conditioning
  • Corridor ceilings, lighting and flooring
  • Select toilet room walls, finishes and fixtures
  • Cafeteria ceilings, lighting and air conditioning

 

 

Health and Safety and Building Condition Survey projects:

  • Fire alarm system upgrades
  • Upgrades and replacement of original HVAC equipment
  • Electrical panel replacement
  • Building controls upgrades
  • Public address (PA) and clock system upgrades
  • Ventilation and air management updates

 

 

 

A floor plan shows the Northside Elementary School renovation project, including highlighted areas for new flooring, air conditioning, classroom renovations, bathroom renovations and health and safety updates.

Scope of proposed work at Northside School:

  • Select classroom renovations, including walls, doors and flooring
  • Library partition and air conditioning
  • Corridor ceilings, lighting and flooring
  • Select toilet room walls, finishes and fixtures
  • Cafeteria ceilings, lighting and air conditioning

 

Health and Safety and Building Condition Survey projects:

  • Fire alarm system upgrades
  • Upgrades and replacement of original HVAC equipment
  • Electrical panel replacement
  • Building controls upgrades
  • Public address (PA) and clock system upgrades
  • Ventilation and air management updates
  • A floor plan shows the Dudley Elementary School renovation project, including highlighted areas for new flooring, air conditioning, classroom renovations, bathroom renovations and health and safety updates.

    Scope of proposed work at Dudley School:

    • Select classroom renovations, including walls, doors, flooring and classroom bathrooms
    • Library corridor wall and air conditioning
    • Corridor ceilings, lighting and flooring
    • Select toilet room walls, finishes and fixtures
    • Cafeteria ceilings, lighting and air conditioning

     

     

    Health and Safety and Building Condition Survey projects:

    • Fire alarm system upgrades
    • Upgrades and replacement of original HVAC equipment
    • Electrical panel replacement
    • Building controls upgrades
    • Public address (PA) and clock system upgrades
    • Ventilation and air management updates

     

     

     

  • A floor plan shows the Northside Elementary School renovation project, including highlighted areas for new flooring, air conditioning, classroom renovations, bathroom renovations and health and safety updates.

    Scope of proposed work at Northside School:

    • Select classroom renovations, including walls, doors and flooring
    • Library partition and air conditioning
    • Corridor ceilings, lighting and flooring
    • Select toilet room walls, finishes and fixtures
    • Cafeteria ceilings, lighting and air conditioning

     

    Health and Safety and Building Condition Survey projects:

    • Fire alarm system upgrades
    • Upgrades and replacement of original HVAC equipment
    • Electrical panel replacement
    • Building controls upgrades
    • Public address (PA) and clock system upgrades
    • Ventilation and air management updates
A

Upgrading classroom facilities at Dudley Elementary School

The proposed scope of classroom renovations in the Fairport for the Future 2025 CIP at Dudley includes full overhauls of classroom bathrooms attached to the classrooms selected for upgrades. As a K-2 school, the needs of our youngest learners include an in-room bathroom facility, including a toilet and sink fixture. The classrooms identified in this proposed project are adjacent to the school library, which is also targeted to be partitioned off to increase the number of large group spaces with air conditioning.

A

Updating classroom spaces at Northside and Dudley Elementary Schools

Staff and families at Northside and Dudley Schools say that storage, accessibility, modern fixtures and improvements to tired, outdated classrooms are a top priority. The Fairport for the Future 2025 Capital Improvement Project targets classrooms adjacent to spaces where renovation work is proposed - in the case of Northside and Dudley, that means classrooms near the library, at the front of the building. These spaces are also near the brand-new Main Offices and Nurses' Offices and are framed by new flooring in both schools, creating a seamless upgrade to the first hallway that our families and students see when they walk in our buildings!